Carv: Prototypes that show whether the team can cover the work
The job
Small and mid-sized teams can tell you what they logged. They cannot tell you whether a late client, a slow hire, or a surprise win will leave a role short in six weeks. Carv started from that question. The stack on this project is Django and Angular, and the two tools below are the working prototypes.
What we built
The pipeline simulator runs in the browser. A project template holds up to five role blocks inside a 26-week window. Planners drag the blocks. Each new deal clones the template. Full-time equivalents become a capacity line at 40 hours each. A feed rate controls how fast new work arrives. Every project sits in a confidence band: 25, 50, 75, or 100 percent, depending on where it is between first conversation and signed work.
A second prototype allocates hours along a curve, so a role can ramp and taper instead of sitting as a flat block on a calendar.
Outcomes
A planner can see a shortage before the week arrives, and can see which assumption, the feed of new work or the confidence of a deal, created it.